Posts tagged Stakeholder Coordination
RIVERSIDE DRIVE STREETSCAPE IMPROVEMENTS

The Riverside Drive Streetscape Improvements project is a transformative, accelerated infrastructure initiative led by the City of Memphis to enhance connectivity, safety and public accessibility along one of the city’s most iconic corridors adjacent to the Mississippi Riverfront.

Read More
ACCELERATE MEMPHIS: ACTIVATING MEMPHIS 3.0

Accelerate Memphis is the City’s award-winning $75 million infrastructure initiative to activate the Memphis 3.0 Comprehensive Plan across 37 project sites.

Read More
ACCELERATE MEMPHIS: EARLY-STAGE INVESTMENTS

As part of the Accelerate Memphis initiative, Malasri Engineering led early-stage neighborhood investments totaling $400,000 in improvements to community anchors identified in the Memphis 3.0 Comprehensive Plan.

Read More
Soulsville

Soulsville is an Accelerate Memphis project along Walker Avenue from Mississippi Boulevard to Cummings Street. Designed by Kimley-Horn, the Soulsville Walker Ave project encompasses a series of strategic improvements aimed at developing a safer and more accessible environment for everyone, whether traveling by motor vehicle, bicycle, or on foot.

Read More
Memphis Public Investment Guide

As a subconsultant to Interface Studio, Malasri Engineering assisted in the development of the Memphis Public Investment Guide, a toolkit providing crucial information about allowable improvements for local communities. The guide supplements the City of Memphis’ comprehensive master plan, knowns as Memphis 3.0, and was designed to help people understand existing issues in any given neighborhood anchor, and to identify the potential options to help address those issues – allowing citizens to help determine how improvements are made in their own communities.

Read More
Pinch District

The Pinch District is an historic nine-block area in downtown Memphis. Since 2017, Malasri Engineering has been designated as the prime consultant by the City of Memphis Division of Housing and Community Development for the ambitious Pinch District Development Project. Responsibilities include overseeing the infrastructure improvement projects outlined in the $48 million State Infrastructure Fast Track Grant. These projects include a 48” sewer line relocation and three phases of converting overhead utilities to underground.

Read More